(1) The road surface and insulating rubber sheet shall be free of dust, oil and moisture, and must be cleaned and dry;
(2) 120 before sticking ° Clean up the glued surface of vehicle gasoline and apply rubber liquid after drying;
(3) The working temperature is 25 ℃ - 42 ℃, and the air humidity is not higher than 60%;
(4) The bonding surface of insulating rubber sheet shall be lightly roughened with coarse sand wheel, rough sanding paper, wood file, etc. (the edge of the bonding surface of 30-50 mm must be roughened);
(5) Make sure that the rubber liquid is brushed twice on the surface of the glued road and insulating rubber sheet. Dry the first time for 20-30 minutes, and then stick it when the second time is slightly dry;
(6) If the rubber fluid is too thick, it will be troublesome for the engineering construction
(7) After the insulating rubber plate is pasted with the road surface, it is replaced with a round roller weighing more than 5kg and extruded for 5 times;
(8) The construction site should pay attention to ventilation and fire safety;
(9) In the whole process of application, it is found that when the insulation rubber pavement is dried and rolled due to the actual operation of mechanical equipment, the above sticking methods can be used for subsidy and maintenance.